Indroduction

Warranty Registration Form
1
Hunter Warranty
2 3 4
General Handling and Operation

Mast Raising and Lowering System
17A
17B
17C
Launching and Retrieveing Procedures
18A
18B
Maintenance
Water Ballast Tank Winterization
32
Storage/Winterization
33A
33B
Description of Model
Certification Details
34
34B
Buillders Information Plate
35A
35B
Profile with Rig and Sail Dimensions
36A
36B
Dimensions, Capacities, etc
37A
37B
Deck Plan and Hardware
38A
38B
Deck Hardware Parts Listing`
39A
39B
Interior Plan
40A
40B
Running Rigging Deck Plan
41A
41B
Mainsheet and Jibsheet Rigging
42
Proper Cleat Knot
43
Reef Rigging and Instructions
44A
44B
Rigging Specifications
46A
46B
Standing Rigging Plan
47A
47B
47C
47D
Spreader Details
48A-1
48A-2
48B-1
48B-2
Spinnaker Details
49A
49B
Ballast Tank Valve
50
Centerboard Detail
51A
51B
Rudder Detail
52A-1
52A-2
52B
Systems

Potable Water System
53A
53B-1
53B-2
Bilge Pumping System and Through-Hull Locations
54A
54B
Mast Wiring
55
Electrical Schematics
56A
56B
56C
Optional Inboard Engine
57A
57B
57C 57D
Optional Waste System
58A
58B
Anchoring Arrangement
59